Illusion frac plug dissolves downhole to reduce costs and risk
Halliburton recently released the dissolvable Illusion frac plug. The plug, designed to reduce risk and cost for operators by eliminating the need to remove the plug, was spotlighted at the 2015 SPE Annual Technical Conference and Exhibition in Houston. In this video from the conference, Greg Vargus, Product Manager for Unconventional Completions, explains the factors that drove the development of the plug and shares field trial results.