Record single BHA run achieved in North Sea
During the 4,304-m BHA run, one open-hole geological sidetrack and two multilaterals were drilled. The BHA used for this section record consisted of AutoTrak, OnTrak, LithoTrak and CoPilot. The inclusion of CoPilot allowed INTEQ specialists to monitor and optimize drilling dynamics during the entire run from the Norway BEACON centre.