Uncategorized

ND2024 2H_Fig2

Figure 2 shows an example of an operating window when deploying a riserless intervention system in which all downlines can operate safely. At the boundaries of this window, the passive disconnect system should safely disengage the downlines from the well.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button