OGDCL optimizes Sono-8 well in Hyderabad
OGDCL announced the revitalization of the Sono-8 well in district Hyderabad, Sindh. Using advanced production optimization techniques and completing the well with an Electrical Submersible Pump (ESP), OGDCL has increased the well’s oil production to 540 barrels per day. Previously, the well was producing oil through an artificial lift system.