M-J 2023 BP image

The upgrades BP made to a riserless light well intervention system enabled a 1-knot increase in the maximum surface current allowed for the system to operate compared with an off-the-shelf system. This meant that the upgraded system was able to operate on 37 additional days during the testing period, when surface currents were higher than 1.5 knots, as indicated in the graph. That improved capability represented a 25% increase in operational time.