Uncategorized

M/A 2025_AutoFrac4

The risk metric was quantified during testing by the frequency of stages that were terminated with less than 80% of the designed proppant mass placed. Each frac crew saw a noticeable decrease in risk when using Auto Frac. Source: SPE 223511

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Check This Out
Close
Back to top button