Home / Microsites / Global and Regional Markets / ADES wins two new onshore contracts in Saudi Arabia

Laying tiles on drywall # 001

Laying tiles on drywall # 001
Rough plasterboard floor

Drywall is a material that enjoys well-deserved popularity in finishing works. Drywall, in fact, has several advantages: it is environmentally friendly, cheap, and most importantly it allows you to equip an almost perfectly flat surface in a short time. This property of this material is invaluable when installing a subfloor. With the arrangement of the tiled floor, laying of tiles is precisely why it has become so popular.

But working with drywall has a number of features that need to be considered when laying tiles.

Let us consider in detail the tiling of the surface, which is sheathed with plasterboard sheets.

First you need to determine what drywall is in modern construction.

Gypsum plasterboard is a sheet of gypsum, which is glued from the bottom and top with cardboard sheets.

If it is planned to lay on a surface that is sheathed with drywall, stone, clinker or ceramic tiles, it is recommended to use moisture-resistant gypsum fiber sheets (GVLV) instead of standard drywall.

Such a choice is explained quite simply: if the tile is glued to drywall, then on top of the cardboard sheet under the influence of moisture, which inevitably enters the inside of the drywall sheet, it can warp.

Laying tiles on GVL can protect against such problems.

Preparing the surface for laying tiles

In the absence of the possibility of using moisture resistant gypsum fiber sheets, it can be done in this way.

Or rather:

Under the plasterboard sheets, you can put guide strips from each other at a distance of not less than 40 centimeters. Gypsum plasterboards must be glued onto the guide rails, additionally fixed with brackets using a construction stapler or self-tapping screws for thick gypsum plasterboard.

Worth paying attention to! the thinner the gypsum board used to equip the subfloor, the smaller the distance between the guide rails.

Instead of planks, in order to prevent deformation during swelling of the cardboard layer, a stucco polypropylene mesh can be placed on drywall sheets.

The grid is glued to the GCR with glue and is additionally fixed with brackets.

Drywall Primer

Before laying the tile, the drywall surface must be primed. The primer is applied in two steps, while an interval of 30 to 45 minutes is maintained between the application of the primer, depending on the type of primer used. Play Pin Up Casino online. Videoslots, pin-up girls in real games.

Leave a Reply

Your email address will not be published. Required fields are marked *

*